Supply and Installation of Standard isolated Footings
for Tower including (Digging , Shuttering, PC, Steel
re-bars, RC with Sulphant Resistant Cement, backfilling
bituminous insulation and all the Materials required to
complete the work as per specifications and approved
design.
Supply & installation of standard Mechanical Pile
foundation for required diameter according to the
optimum consultant design including demolishing the pile
caps and all required materials to complete the work.
Supply and Installation of GF Security Fence including
Door and all the Accessories required to completing the
work as per specifications.
Supply and Installation of brick parapet, cement
plastering & water base painting as per specifications.
Supply and Installation of Clad Stone to confine the
Level of the Site in case of unstable surrounding area.
Concrete works for the shelter / generator / fuel tank
concrete base, including shoring, excavation,
shuttering, PC, backfilling and insulation, as per
specifications.
Supply & install concrete pipes to install culvert to
access the site including transportation, installation,
compaction & backfilling with all the required materials
to complete the work.
Concrete Testing from Approved Laboratory Assigned by
the client for a min. of 6 Samples signed by the client.
3 samples tested after 7 days & other 3 samples at 28
days.
Construct the
different kinds of the sites access roads that needed.
Site Leveling and Grading for exposed site area, as the
levels are to be constructed to facilitate rainwater
drainage. |